BELOW SURVEY WORKS WE HAVE COMPLETED IN 2020
S.No | WHAT’S WORK DONE | WORK FOR | DETAIL |
1 | Topographic Survey | KPT | Detailed topographic survey and contouring of KPT Izhar Hospital at Keimari, Karachi |
2 | Topographic Survey | Yunus Textile | Topographic survey of 50 acres plot of Yunus Textile at near Lucky cement plant (M9) |
3 | As-built Survey | NAS | 22 pile location pick from constructed site at S.I.T.E area, Karachi |
4 | Topographic Survey | BE Energy | 1.6 Km pipe line route from Terminal 2 to PAPCO header at Port Qasim, Karachi |
5 | Topographic Survey | Yunus Textile | 25 acres exist factory area of Yunus textile with complete detail at Lanhdi Industrial area |
6 | As-built Survey | ZEL | As-built of 57 Gumbat South Gas Plant with 90 equipment’s foundation at Shahdad pur |
7 | Demarcation Survey | Lucky Oil | Marking of New Bench Marks as per drawing with reference of Old BM’s at Dualatpur |
8 | As-built Survey | Global PMC | Alignment of pipe line, levels, of 400 m pipeline exposed in Malir river near Memon Goth |
9 | As-built and Traffic Survey | BE Energy | 4 location of petrol pumps, Multan, Jhang, Faisalabad, Rawalpindi |
10 | As-built Survey | Indus Hospital | Detailed As-built of 6 floor Ali Bhai Auditorium building at Nishter road with Basement floor, Colom size, Beem size, Windows opening, Doors opening, floor levels, Shops detail |
11 | Topographic Survey | Ess-I-Arr | 17 Km road survey from Durji to Lohi at Durji, District Lasbela, Baluchistan |
12 | As-built Survey | Naveena Group | As-built with Column, beam size of existing Naveena Textile factory at S.I.T.E area, Karachi |
13 | Topographic Survey | NSA | 3 Km topographic survey of sewerage line at Amroha Society near Saadi town, Karachi |
14 | Topographic Survey | Reliance Petroleum | 4 acres existing factory of reliance petroleum at Port Qasim Area, Karachi |
15 | Topographic & As-Built Survey | ZEL | 15 acres new land topographic survey & 20 acres existing plant As-built survey with 2Km pipeline route topographic survey of PSO Lalpir depot at Mahmood Kot |
16 | Topographic Survey | BE energy | Topographic survey of 1 Km pipeline route from terminal-1 to PAPCO header at Port Qasim |
17 | As-built Survey | Terminal One | Detail As-built of T-1 and T-2 Terminals with Tanks area, Piping, roads network, boundary limit, equipment foundations |
18 | Topographic Survey | ZEL | 2 Km pipeline route from KE plant to SSGC station at Port Qasim area |
19 | Topographic Survey | Pak Engineers | K.D.L.B building top roof and 1st floor roof precise level survey near Jinnah flyover, Karachi |
20 | Topographic Survey | NSA | Amroha Society roads survey near Sadi town, Karachi |
21 | As-built Survey | ZEL | Shell airport depot detail as-built at Karachi Air port |
22 | Topographic Survey | BE Energy | 7 acres land and 1.5 Km pipeline survey of Gatti depot at Faisalabad, Punjab |
23 | Boundary Survey | Lucky Oil | Verification of UTM coordinate at Dualatpur depot |
24 | Boundary Survey | Hilton Pharma | Verification of 30 acres boundary with UTM coordinate at Memon Goth |
25 | As-built Survey | Reliance Petroleum | Detail As-built survey of Ground floor and 1st floor at plot no-47, Wast Warf road Keimari, Karachi |
26 | Topographic Survey | Orient Energy | 2 Km topographic survey for road at Tricom Power project, Nooriabad |
27 | Boundary Survey | Lucky Oil | Conformation of disputed plot boundary with Patwari and land owner at Dualatpur |
28 | Boundary Survey | BE energy | Verification of Thaliyan depot UTM coordinate at near Islamabad |
29 | Digital mapping | Hub Co | 37 Km Pipe line route drawing convert in KML and GIS base. |
30 | Topographic and Traffic Survey | BE Energy | 18 petrol pump location for Topographic survey and Traffic survey at Sindh and Punjab |
We do not compromise on accuracy, this is our hallmark.