BELOW SURVEY WORKS WE HAVE COMPLETED IN 2017

S.No

WHAT’S WORK DONE

WORK FOR

DETAIL

1

Topographic Survey

BE Energy

Topographic survey of 5 acres plot and 3 Km pipeline route for oil depot at Mahmood Kot

2

Execution Survey

Fortsole

Associate with Fortsole (Pvt.) Ltd. execution work in SEPCO plant at Port Qasim( Nov,16 to March, 2017 )

3

Topographic Survey

BE Energy

Topographic survey of 1.5 Km pipe line from BE depot to PARCO terminal at Shikarpur

4

Topographic Survey

NAS

Topographic survey 25 acres plot of Chilya Masjid at Near Thatta City

5

Topographic Survey

HFP

Topographic survey of Hockey Club Of Pakistan

6

Topographic Survey

The Architect

Topographic survey of plot at 9th street, khy-Shamsheer, D.H.A-V, Karachi

7

Topographic Survey 

The Architect

500 m length 20 m wide strip survey at Dolmon mall Hydari, Karachi

8

Topographic Survey

NAS

Topographic survey of SIPCA inks area at Malir Halt, Karachi

9

Reconnaissance  Survey

ZEL

37.5 Km pipeline reconnaissance survey from Vejihar to EPTL plant at Islamkot

10

Topographic Survey

Orient Energy

Topographic survey of 2267 acres land for Zephyr Wind power project in Gharo, detail survey of 1100 acres land in big creeks (Offshore) and 1167 acres land on shore, with 0.2 m contours.

11

Topographic Survey

ZEL 

Topographic survey for re-alignment of PARCO pipe line at Trimmu Head, Punjab

12

Reconnaissance Survey

Alternate Energy

450 acres desktop study for wind power project at Nooriabad

13

Topographic Survey

STS

Topographic survey of 100 acres land of SEPCO for Ash yard at Port Qasim 

14

Topographic Survey

Logix Associates

Detail topographic survey of 2000 road & 9000 road at N.Karachi Industrial area, Karachi

15

Topographic Survey

Logix Associates

Detail Topographic survey of North Karachi Industrial area all roads for infrastructure   

We do not compromise on accuracy, this is our hallmark.