BELOW SURVEY WORKS WE HAVE COMPLETED IN 2019
S.No | WHAT’S WORK DONE | WORK FOR | DETAIL |
1 | Topographic Survey | Hub Co | Topographic Survey of 250 acres land for Ash yard, Pond area and Colonies at Islam Kot |
2 | Topographic Survey | Hub Co | Topographic Survey of 10 acres plot near Power Plant |
3 | Topographic Survey | ZEL | Topographic survey of 300 acres land at Lotte pumping station near Haleji lake |
4 | Boundary Survey | Ali Asghar Textile | Boundary verification of disputed wall in-between Ali Asghar Textile and Getz Pharma |
5 | As-built Survey | ZEL | As-built survey of Dyke wall of SSGC LPG plant with sections at Port Qasim area |
6 | Boundary Survey | Hijaz-e-Moqads | Disputed boundary survey of plot no-56, overseas Society at Karachi |
7 | Topographic Survey | ZEL | Topographic survey of APL pipeline exposed in flood near at Hub Choki |
8 | Topographic Survey | Terminal One | 5 acres plot for Oil depot at Dualatpur |
9 | Topographic Survey | Orient Energy | 342 acres plot for Tricom Wind power project at Jhampir district, Nooriabad |
10 | Topographic Survey | NAS | 4 acres plot at S.I.T.E area, Karachi |
11 | Boundary Survey | Hijaz-e-Modads | Re-boundary survey of Overseas society plot after settlement of dispute |
12 | Topographic Survey | Reliance petroleum | Topographic survey of plot no-47, West Wharf road at Keimari |
13 | Topographic Survey | Nanital House | 2000 SYD plot no-56 at Faran Society at PECHS, Karachi |
14 | Topographic Survey | Akmal | 4 acres plot at Memon Goth, Karachi |
15 | Topographic Survey | ZEL | 37 Km length, 50 meter wide corridor for pipe line survey at Vijihar to EPTL at Islam Kot |
16 | Topographic Survey | Global PMC | Topographic survey for re-routing of 1 Km PARCO pipeline at Sihala, Islamabad |
17 | Topographic Survey | BE Energy | Re-survey of Thallian depot after change of location at Thallian, Islamabad |
We do not compromise on accuracy, this is our hallmark.