Cement Plant Survey Work Experience

Attock Cement Plant

Execution survey for ACL project of Attock cement line-2, From February 2005 to September, 2006 at Hub Choki, Baluchistan.

Responsibilities

Executed the plant design as per drawings and controlled the distance, angles and levels given on the drawing.

Horizontal & Vertical Control of

  • Vertical Raw Mill
  • Raw Material Grinding
  • Raw Material Proposing
  • Shell &Iron Storage
  • Preheater
  • Kiln Inlet Bag Filter
  • Blanding Silo
  • Centre Control Room
  • Compressor
  • Cone
  • Kiln
  • Clinker Cooler
  • Cyclone
  • Hot Gas Bag Filter
  • Under Ground Water Tank
  • A/C Tower
  • Clinker Silo
  • Pump House

 