Traffic Survey

We have decades of experience in topographic and as built surveying, but we also think of some new angles, which is why we have stepped into a new field.

In 2019, one of our esteemed client, upon our request, offered us the opportunity to participate in a trade area analysis project to convert new petrol pumps and some existing pumps across the country.

Which we did together with one of our sister company in which our responsibility was to carry out topographical survey of new pump sites and As built survey of existing pumps along with traffic survey.

We conducted Trade area analysis of Be energy across Pakistan, below list of some projects.

Projects

  • New site Syed Filling Station at City Gate, Hyderabad
  • Existing Caltex City, Makhi Shah Road, Hyderabad
  • New site at Panggrio, Badin
  • New site at Qazi Ahmed road, Nawabshah
  • Existing New Sunny pump at Shikarpur
  • 2 New sites at Islamabad New site Dar-Sakina road, Jhang
  • New site at Narowal
  • Existing Ahmed Petroleum at Burewala road Chichawatni city
  • Existing Roomi filling at Main Channu-Abdul Hakim road, Khanewal
  • Existing Al-Qaim at Rajana interchange, Toba Tek Singh
  • Existing Gas con CNG at Qazafi chowk, Multan
  • Existing Al-Mumtaz filling at Tehsil Shujabad, Multan
  • Existing Ahmed Azam at Budhla road, Multan
  • Existing Friends Petroleum at Jalapur, Pirwala
  • Existing Nizamuddin Awlia at Muzaffargarh
  • Existing Tarar Petroleum at Phalia, Gujrat
  • Existing Al-Hafiz pump at Yazman road, Bhawalpur

Solutions

We have expertise in traffic studies which we find the method to complete the field work and office work in minimum time considering the area of traffic studies, traffic census with accuracy.

We do not compromise on accuracy, this is our hallmark.

The Benefits

We always prefer to use modern technology-based traffic surveying software’s and carry out the traffic survey through best methodology and software’s to pass on time and money saving benefits to our clients.

Ask a Question



    11 Years Record

    Sustainability

    Professional relationships depend on accuracy of work, low cost, on-time completion and aiding to client’s concerns and objections even months later. We adhere to all these for the sustainability of professional relationships.

    Project Completion

    The most important factor in the cost of any development project is its timely completion; starting with the surveying work, our priority is to complete our work before the given time frame.

    Modern Tech

    The world is busy trying to make every work easier every day. To keep ourselves involved in this era of development, we use modern technology based surveying instruments.

    Latest Software

    In this era of innovation, we adapt ourselves to the developing pace of the world in order to perform our work better, for which we prefer to use the latest software.

    We do not compromise on accuracy, this is our hallmark.