Execution Survey

We have two decades of unblemished and proud history of proving our capabilities in execution survey work within the country.

In the year 2000, we introduced a new concept to construction companies to hire a surveying company for the completion of their projects which reduced their time, cost and responsibility. It was greatly appreciated and for many years we have been working as survey contractors with reputable companies in Pakistan, the top being ACL    

We have the experience of completing Center Point building, the former second tallest building of Pakistan from piling to top floor. The projects we have completed from start to finish through horizontal and vertical control include cement plants, high rise buildings, oil & gas plants, runway, hotel, school, and bungalows.

We have expertise in horizontal and vertical control in construction projects such as oil and gas plant equipment foundations, evaporation pond, cement factory buildings like preheater, cyclone, kiln, and embedded items like placing of anchor blot, pockit, plate, and high rise buildings etc.

We do not compromise on accuracy, this is our hallmark.

We have a long history of execution survey which includes extensive experience in major projects that we have completed.

Projects

  • BHP Zamzama Gas plant at Dadu District
  • Sawan Airstrip and Gas plant at Khairpur District
  • Attock Cement plant line II at Hub Choki, Baluchistan
  • Creek Vista at D.H.A, Karachi
  • Center Point building at Karachi
  • Creek Club (Ramada Hotel) at D.H.A, Karachi
  • Kamoki Power plant at Gujranwala District
  • Nooriabad Power Plant at Nooriabad, Sindh
  • Narowal Power plant at Narowal
  • Multiple Banglows

Solutions

We have extensive experience in construction sector to implement the design according to its spirit; we use different types of surveying instruments to solve the problems of vertical control according to the nature of the project.

We do not compromise on accuracy, this is our hallmark.

The Benefits

The benefit of hiring us is that we are bound to immediately replace any worker or instruments that are not suitable without slowing down the pace of work. It is our responsibility to deliver each and every structure layout ahead of time as per the company’s plan which increases the speed of work.

Ask a Question



    11 Years Record

    Sustainability

    Professional relationships depend on accuracy of work, low cost, on-time completion and aiding to client’s concerns and objections even months later. We adhere to all these for the sustainability of professional relationships.

    Project Completion

    The most important factor in the cost of any development project is its timely completion; starting with the surveying work, our priority is to complete our work before the given time frame.

    Modern Tech

    The world is busy trying to make every work easier every day. To keep ourselves involved in this era of development, we use modern technology based surveying instruments.

    Latest Software

    In this era of innovation, we adapt ourselves to the developing pace of the world in order to perform our work better, for which we prefer to use the latest software.

    We do not compromise on accuracy, this is our hallmark.